Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Tod Consulting Stormwater Plans v2 · 132003.221172.A

Attached to the e-mail Change to DA - 132003.221172.A.msg.

of 22

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
61 ELANDA STREET SUNSHINE BEACH
Comparison of new development catchments to original catchments in Aquaintel SWMP

J/N - 18505
Original Development - SWMP by Aquaintel
Table 1 from SWMP
   WBNM Sub-catchment        Area (m2)     Developed Scenario   equivalent
                                             Impervious %     impervious area
                                                                   (m2)
Roof (to street)                90               100%               90
Roof                            130              100%               130
Drive to Rear                   36               100%               36
North East Grass                70                50%               35
North side                      59                50%              29.5
South Side                      65                50%              32.5
Backyard                        56                10%               5.6

                                           Total to rear                268.6 m2

                                           spilt - north (60%)         161.16 m2
                                           split - south (40%)         107.44 m2

New development catcments

    Tod Sub-catchment        Area (m2)     Developed Scenario   equivalent
                                             Impervious %     impervious area
                                                                   (m2)
Roof (to street)                90               100%               90
Roof - north                    68               100%               68
Roof - south                    59               100%               59
Drive to Rear - north           62               100%               62
Pool deck area - south          50                70%               35
North side                      45                50%              22.5
South Side                      48                50%               24
Backyard                        56                10%               5.6

                                           Total to rear                276.1 m2

                                           Split - north                155.3 m2
                                           Split - south                120.8 m2

D Reynolds                  CHANGE         North                        -5.86 m2
PREQ 9072                                  South                        13.36 m2
26-Feb-18

Used in these records

About this file

File size
6.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Tod Consulting Stormwater Plans v2.pdf · 6.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.