Debbie Munro Ziganairre Pty Ltd by email 3 August 2017 61 ELANDA STREET, SUNSHINE BEACH – STORMATER QUANTITY ASSESSMENT Dear Debbie, AquaIntel have been commissioned by Ziganairre Pty Ltd to undertake a stormwater quantity assessment to address an Information Request by Noosa Shire Council dated 13 July 2017 (OPW17/0225) for the proposed development at 61 Elanda Street, Sunshine Beach. During this investigation discussion with Noosa Council were undertaken in order to seek clarification on the intent of the development conditions and on the status of the legal Point of Discharge for the site. It was advised that stormwater could be discharged to the street as long as the maximum rate at which it was discharged is limited to the requirements of the conditions and that if runoff cannot be directed to the street then stormwater must be infiltrated underground in order to minimise any potential issues with stormwater flows increasing into neighbouring properties as a result of the development. SITE AND CATCHMENT The proposed site is located at 61 Elanda Street, Sunshine Beach. An existing residence is located on the western portion of the site. Currently stormwater is discharged to the ground within the site. The total site area is 505 m2 and the site falls to the east at a grade of approximately 12.5%. Stormwater runoff would currently flow overland towards the rear of the property at the South East corner of the site. No evidence of a formalised stormwater infiltration system has been located. Total catchment area assessed is 600m2 which includes the site and rear falling verge. Of this catchment 90m2 of roof will be discharged to the Elanda Street. The development conditions for the site specify that a maximum flow of 25L/s at any one location is to be discharged to the road, of which it understood that the development complies with this condition. The catchment is shown below in Figure 1. m: 0439 119 890 t: +7 5414 7185 e: [email protected] w: www.aquaintel.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Tod Consulting Stormwater Plans v2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.