OZCARE NOOSA AGED CARE RESIDENCE Construction Management Plan
2.5 Project Organisational Chart
WOOLLAM CORPORATE SUPPORT
Managing Director: Craig Percival
Executive Director: George Bogiatzis
General Manager: Dan Jebbink
Area Manager SEQ: Mitch Perry
Commercial Manager: Carolyn Cox Project Manager Design Manager Cost Planner
Construction Manager: Matt Collyer BRYAN WARD Troye Gibbs Robert Marcellus
HSEQ Manager: Cameron Stewart
Project Administrator Contracts Administrator Consultants
TBA BEN LUCK
Site Manager
TBA
Site HSEQ Advisor Site Engineer Site Foreman Finishes Foreman Defect/Commiss. Foreman
TBA TBA RICHARD ROBAZZA TBA TBA
Apprentice
Labourer
Contract Partners
Woollam Constructions Page 5 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.