Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 130, section 1. The text section number identifies this passage in the reader.

OZCARE NOOSA AGED CARE RESIDENCE                                                           Construction Management Plan


               •    Establish and maintain Erosion and Sediment Control as required to each Stage of works.
                    (refer separate Environmental Management Plan).
               •    Implement and Installation of Vegetation Management Plan including control for protection
                    of nominated trees zones etc.
               •    Protect existing infrastructure as required by documents and per relevant DA conditions.
               •    Grubbing of vegetation including having Spotter Catcher in attendance during nominated
                    works in accordance with DA conditions.
               •    Demolition of existing buildings and structures in preparation for civil works.
               •    Civil/Earthworks completed to all stages on completion of demolition works. All works
                    complete to earthwork drawings and design levels as per DA requirements.
    All Stages - Substructure/Superstructure/Services

               •    Install of inground services (stormwater, sewer, electrical) and connections back into the
                    existing infrastructure as documented.
               •    Pad footings throughout site where required and noted on the design documents.
               •    Setup of Self Erecting Tower Crane.
               •    Excavations strip and ground beams.
               •    Concrete pours in ground works.
               •    Completion of Concrete, blockwork retaining walls (incl backfill and waterproofing).
               •    FRP Ground Slabs throughout the program.
               •    Installation of concrete columns and Suspended slabs.
               •    Installation of structural steel roof framing.
    All Stages - Façade/Finishes External Works

               •   Installation of Façade and roof cladding/ applied finish and windows.
               •   Installation of Balcony handrails.
               •   Internal fit out throughout buildings.
               •   External landscaping to each stage.
               •   Full site landscaping throughout.

         2.2        Time Frame
         The construction of the entire project is forecast at an overall programme deliverable of approx. 156
         weeks. Site establishment and enabling works is anticipated to commence late in 2024 with
         construction forecast to be completed in stages up to mid-2027.

         2.3        Site Contacts
         The Project Site Office address where the construction activities will be managed from is:

               Street Address:                80 Cooyar Street, Noosa Heads QLD 4567
               Postal Address:                PO Box 7154, East Brisbane Qld 4169
               Contact Number:                1300 WOOLLAM


         2.4        Off Site Management and Site Management Structure
         The management and site management structure is as per the following Project Organizational Chart.




Woollam Constructions                                                                                            Page 5 of 17

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.