Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 221, section 1. The text section number identifies this passage in the reader.
22. Emergency Drill Evaluation
An Emergency Drill of the site will be conducted in line and in the frequency identified in the Emergency
Preparedness and Response plan. They should be scheduled on site to ensure that they are scenario based and
test a variety of potential emergency situations.
The drill will be analysed, and any follow up actions identified. These details will be recorded on the
Emergency Drill Evaluation form on a cloud-based software system. Once all follow up actions are complete
than the evaluator shall sign the evaluation form.
This form will be kept electronically. A record is also created in Sign-Onsite.
22.1 Supporting Documents
Emergency Drill Evaluation (Procore document)
As found in Procore
WHS Management Plan / Page 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.