Skip to the record
Beware of cheap imitations.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 222, section 1. The text section number identifies this passage in the reader.

23. Site Personnel Sign In
All persons entering and exiting the site will sign in and sign out on a cloud-based software system Sign-On
Site.
The following information will be recorded:
    •    Name.
    •    Company.
    •    Date.
    •    Acceptance of Daily Pre-start
    •    Time in.
    •    Time out.
Sign in information will be filled, and can be accessed, through the relevant project online portal.




                                                                                       WHS Management Plan / Page 42

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.