Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 236, section 1. The text section number identifies this passage in the reader.

WHS Management Plan / Page 56


[OCR of page images]
a5 Do you have a Safe Work Method Statement for the task at hand? This should identify the risks and and state the contro! measures
required to eliminate or minimise the risk

3.6 = Are. you trained, competent and comfigent im applying particular procedures or techniques that are required for the task?

37 Have you checked to ensure that your tools and accessories are insulated and have been ieapected and maintained to ensure they
are serviceable 7

3.8 ts you test equipment appropeiate to the task and functioning correctly?
3.9 Are you wearing the appeopriate clothing and PPE for the task?

3.10 Do you have the appropriate insulsted mats and sheeting?

3.11 ts a safety observer prosont?

3.12 Aro the necessary first aid facilities provided and accessible and aro unauthorized persons prevented from entering the work area?

Part 4 AFTER COMPLETING INITIAL ISOLATION AND TESTING IN WORK AREAS

at After isclation and testing | have tested to the best of my knowledge and physical ability to access services in the work ares. Any
cables! services which are still found to be energised after testing have been marked in accordance with the current AS/NZS 1012

42 Ihave identified energised services using different cable sheaths of a different colour

4.3 Ihave attached yellow tape spaced # intervals of mo leas than Sem marked with the words constructice wiring

PART 5 AFTER COMPLETING THE WORK ( FINAL INSPECTION)

5.1 Have the installations/ circults‘equipment been restored to a safe and operable condition?
52 Have alll tags and locking off devices been removed?

53 | have Inspected and tested to the best of my knowledge and physical ability to access services in the work area and find them
undamaged.

 

wool lam / WORKING TOGETHER WHS Management Plan / Page 56
CONSTRUCTIONS TO BUILO LEGAQES

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.