Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 268, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Proposed Controls
Initial
HOC
Risk
Risk
Activity Hazard Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Incorrect process HIGH 5 All incidents on site will be reported to site management and recorded Procore\ depending on the treatment to be L Site Management
included in site specific induction
Inadequate first aid HIGH 5 A first aid kit will be maintained onsite and be able to be transported throughout the workplace in an emergency. L Site Management
equipment / facilities
Biological HIGH 5 Spills of blood and other bodily substances will be treated as potentially infectious and cleaned up in accordance with the M First Aid Officers
First Aid Code of Practice (applicable to state). (I.e. Use of PPE, disinfection, and isolation of area).
Spills of blood or other bodily substances will be immediately barricaded to prevent persons from walking / tracking
through the spill.
Project Hazard/Risk Assessment / Page 26 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.