7. Work Environment Hazards
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
7.1 Hazardous Manual Tasks
Manual Tasks Repetitive lifting HIGH 2 Mechanical equipment will be used for manual handling tasks wherever practicable on site including the M Site Management
use of: Contract Partner
Musculoskeletal HSE Advisor with BSBWHS414 OHS
injury ☐ Crane Cert 4 with BSBWHS414 OHS Cert 4
☐ Man (Personnel) / Materials Hoist
☐ Forklift (or other vertical lifting equipment)
☐ Pallet trolley
Repetitive lifting HIGH 5 Material delivery will be organised to enable unloading onsite by mechanical means and to minimise M Site Management
manual handling. Contract Partner
Musculoskeletal HSE Advisor with BSBWHS414 OHS
injury Cert 4
Slips trips or falls HIGH 5 Material storage areas will be specified on site. L Site Management
HSE Advisor with BSBWHS414 OHS
Cert 4
Unsafe manual HIGH 4 Wherever practicable all objects will be designed, constructed, and purchased to enable safe manual L Site Management
handling practices handling. Weight of materials to be identified. HSE Advisor with BSBWHS414 OHS
Cert 4 with BSBWHS414 OHS Cert 4
Contract Partner
Activity planning HIGH 5 Where workers are required to perform manual handling tasks a suitable SOP or SWMS will be provided L Site Management
and hazard and workers to complete training and instruction the SOP / SWMS for manual tasks on site. Contract Partner
identification HSE Advisor with BSBWHS414 OHS
Cert 4
7.2 Pandemic
Construction activities Failure to adhere HIGH 5 Woollam and all Contract Partners shall provide a process for the management of their workers during a M Contract Partner
to government pandemic in alignment with government controls.
advice
Failure to adhere HIGH 5 Implementation on site of the controls listed in the Keeping People Safe Plan (COVID-19) or project M Site Management
to government specific COVID Management Plan (i.e. COVID or other pandemic specific)
advice
Maintenance of HIGH 5 Monitor the availability of all required resources through completion of the Weekly Inspection site Safety L Site Management
controls. Inspection.
Project Hazard/Risk Assessment / Page 27 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.