Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Working in heat HIGH 5 All PCBU’s have an obligation to train workers in the process of heat related hazard identification when M Site Management
working in excessive temperatures and will identify and implement the relevant and effective control Contract Partner
measures required to address such situations. HSE Advisor with BSBWHS414 OHS
Cert 4
Key steps in managing work in excessive temperature events include:
- Undertaking detailed forward planning in preparation for the periods of the year when excessive
temperatures may occur.
- Understanding the potential of the forecast and impending weather conditions
- Conducting effective consultation with all relevant parties regarding the scheduling of work and the
rostering of individuals at times when excessive temperatures occur
- Providing appropriate cool water stations and shade facilities
- Ensuring that control measures are implemented in a timely manner.
- Monitoring the ongoing wellbeing of workers
- Provision of additional shade where possible
- take adequate rest breaks out of the sun.
- rotate jobs where possible.
- use of additional fans where required to circulate air.
- Site toolbox on the effects of heat and methods for safely managing heat
Working in heat HIGH 6 Sun protection measures to protect from UV radiation may include: M Site Management
Contract Partner
- Seek shade.
- Wearing a hard hat with shade brim to protect face and neck.
- Wearing wraparound tinted safety glasses.
- Using SPF broad spectrum sunscreen, this should be reapplied every 2 hours.
- Where suitable wear long sleeved high-vis shirts
Workers not HIGH 6 Site PPE requirements (hard hat, protective footwear, high vis clothing) will be communicated to M Site Management
informed of workers prior to commencement of work and during induction. Contract Partner
mandatory PPE Signage specifying the mandatory wearing of personal protective equipment will be erected.
requirements for
the project.
Reference AS/NZS 1801 Occupational protective helmets
AS/NZS 2210 Safety footwear
AS/NZS 1270 Acoustics - Hearing protectors
AS/NZS 1337 Eye protectors for industrial applications
Project Hazard/Risk Assessment / Page 29 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.