Skip to the record
The gold standard in government transparency.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 270, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                      Residual
                                                    Rating
                                                    Initial
                                                                                                                 Proposed Controls




                                                     Risk




                                                                                                                                                                                        Risk
        Activity                  Hazard                                                                                                                                                               Responsible Person




                                                              HOC
                                                                                     (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)

                            Failure to identify   EXTREME     5     Communication to projects to convey government updates and areas of close contact, project teams to                M         Woollam Management
                            areas of close                          disseminate this information on their projects.                                                                              Site Management
                            contact or public
                            concern

Reference                   Covid Management Plan


     7.3Noise, Dust and Heat
Planning for construction   Exposure to noise       HIGH      5     Assessment of plant and equipment use on site will review noise exposure of workers and site teams.                M         Site Management
activities                                                          Where there are ongoing loud activities works will be planned to provide breaks in the activity.

                                                    HIGH      6     Workers and visitors will wear additional PPE when determined as a control measure by documented risk               L        Site Management
                                                                    assessments for specific construction site tasks / SWMS.                                                                     Contract Partner’s
                                                                                                                                                                                                 Visitors
                                                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                                                 Cert 4
                                                    HIGH      5     Noise monitoring to be implemented where excessively noisy activities are planned for a prolonged                   L        Site Management
                                                                    period that exceeds guidelines in the Health Monitoring Policy.                                                              Contract Partner’s
                                                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                                                 Cert 4
Planning for construction   Exposure to dust        HIGH      3     Works will be planned on site to minimise dusty works on site – refer Environmental Controls section of             L        Site Management
activities                                                          this PRA.                                                                                                                    Contract Partner
                                                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                                                 Cert 4
                                                  MEDIUM      6     RPE is to be fit tested in accordance with Australian Standards, with workers trained in the proper use,            L        Site Management
                                                                    maintenance, and storage of the personal protective equipment.                                                               Contract Partner
                                                                                                                                                                                                 HSE Advisor with BSBWHS414 OHS
                                                                    refer to Dust - Respirable Crystalline Silica Dust (RCS) section of this HAZARD / RISK REGISTER for specific                 Cert 4
                                                                    controls for RCS.

During works                Uneven / sharp          HIGH      6     Safety boots will be worn on site at all times unless a documented risk assessment has been undertaken              L        Site Management
                            floor surfaces                          to indicate otherwise and this has been supplied to and accepted by the Site Manager in consultation with                    Contract Partner
                            resulting in injury                     the HSE Advisor with BSBWHS414 OHS Cert 4 and Safety Manager.                                                                HSE Advisor with BSBWHS414 OHS
                                                                                                                                                                                                 Cert 4




                                                                                                                                                     Project Hazard/Risk Assessment / Page 28 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.