Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Failure to identify EXTREME 5 Communication to projects to convey government updates and areas of close contact, project teams to M Woollam Management
areas of close disseminate this information on their projects. Site Management
contact or public
concern
Reference Covid Management Plan
7.3Noise, Dust and Heat
Planning for construction Exposure to noise HIGH 5 Assessment of plant and equipment use on site will review noise exposure of workers and site teams. M Site Management
activities Where there are ongoing loud activities works will be planned to provide breaks in the activity.
HIGH 6 Workers and visitors will wear additional PPE when determined as a control measure by documented risk L Site Management
assessments for specific construction site tasks / SWMS. Contract Partner’s
Visitors
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 Noise monitoring to be implemented where excessively noisy activities are planned for a prolonged L Site Management
period that exceeds guidelines in the Health Monitoring Policy. Contract Partner’s
HSE Advisor with BSBWHS414 OHS
Cert 4
Planning for construction Exposure to dust HIGH 3 Works will be planned on site to minimise dusty works on site – refer Environmental Controls section of L Site Management
activities this PRA. Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
MEDIUM 6 RPE is to be fit tested in accordance with Australian Standards, with workers trained in the proper use, L Site Management
maintenance, and storage of the personal protective equipment. Contract Partner
HSE Advisor with BSBWHS414 OHS
refer to Dust - Respirable Crystalline Silica Dust (RCS) section of this HAZARD / RISK REGISTER for specific Cert 4
controls for RCS.
During works Uneven / sharp HIGH 6 Safety boots will be worn on site at all times unless a documented risk assessment has been undertaken L Site Management
floor surfaces to indicate otherwise and this has been supplied to and accepted by the Site Manager in consultation with Contract Partner
resulting in injury the HSE Advisor with BSBWHS414 OHS Cert 4 and Safety Manager. HSE Advisor with BSBWHS414 OHS
Cert 4
Project Hazard/Risk Assessment / Page 28 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.