STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 274, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Work environment HIGH 5 Work is to be suspended immediately and access to the area restricted, pending reassessment of the M Site Management
changes confined space. Contract Partner
Trench collapse HIGH 3 Prior to entering excavations suitable controls (benching, battering, shoring) or geotechnical engineer sign M Site Management
off to be obtained. Contract Partner
Engulfment HIGH 5 Entering manholes and drainage pipes will not occurring during rain event or immediately after where M Site Management
there is a risk of water egress. Contract Partner
Worker/s HIGH 5 A method of communication is established in the work procedures to allow constant monitoring of those M Site Management
becoming persons working in the confined space. Contract Partner
incapacitated and
requiring rescue
Other workers or HIGH 4 Where confined spaces are to remain open all work areas are to have access is to be restricted by way of M Site Management
plant and barricading and signage. Contract Partner
equipment falling
into manholes /
confined space
work areas
Reference AS 2865 - Confined spaces
7.5 Hot Work
Planning Task planning and HIGH 5 All tasks involving welding or hot work will have an approved work method in place L Site Management
task hazard Contract Partner
identification
Fire HIGH 5 Hot Work Permit, will be required prior to any hot work on site. Permit to be located at the site of works M Site Management
in a nominated location on the permit. Permits are to be issued and closed on a daily basis or within one Contract Partner
Damage to
property active shift.
Injury to worker HIGH 4 Flash back arresters will be fitted to all oxy-acetylene equipment. Within 12 months of valid test. M Site Management
Contract Partner
Fire HIGH 5 Fires watch person will be used at any time where hot works are carried out. This watch is to continue at M Site Management
least 60mins after work has ceased before permit can be signed off. Contract Partner
Damage to
property A suitable fire extinguisher will be provided in proximity where welding/hot work processes are carried
out on site.
Project Hazard/Risk Assessment / Page 32 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.