STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 274, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                Residual
                                              Rating
                                              Initial
                                                                                                           Proposed Controls




                                               Risk




                                                                                                                                                                                  Risk
           Activity          Hazard                                                                                                                                                              Responsible Person




                                                        HOC
                                                                               (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)

                      Work environment        HIGH      5     Work is to be suspended immediately and access to the area restricted, pending reassessment of the                 M         Site Management
                      changes                                 confined space.                                                                                                              Contract Partner

                      Trench collapse         HIGH      3     Prior to entering excavations suitable controls (benching, battering, shoring) or geotechnical engineer sign       M         Site Management
                                                              off to be obtained.                                                                                                          Contract Partner

                      Engulfment              HIGH      5     Entering manholes and drainage pipes will not occurring during rain event or immediately after where               M         Site Management
                                                              there is a risk of water egress.                                                                                             Contract Partner

                      Worker/s                HIGH      5     A method of communication is established in the work procedures to allow constant monitoring of those              M         Site Management
                      becoming                                persons working in the confined space.                                                                                       Contract Partner
                      incapacitated and
                      requiring rescue

                      Other workers or        HIGH      4     Where confined spaces are to remain open all work areas are to have access is to be restricted by way of           M         Site Management
                      plant and                               barricading and signage.                                                                                                     Contract Partner
                      equipment falling
                      into manholes /
                      confined space
                      work areas

Reference             AS 2865 - Confined spaces


     7.5 Hot Work
Planning              Task planning and       HIGH      5     All tasks involving welding or hot work will have an approved work method in place                                  L        Site Management
                      task hazard                                                                                                                                                          Contract Partner
                      identification

                      Fire                    HIGH      5     Hot Work Permit, will be required prior to any hot work on site. Permit to be located at the site of works         M         Site Management
                                                              in a nominated location on the permit. Permits are to be issued and closed on a daily basis or within one                    Contract Partner
                      Damage to
                      property                                active shift.

                      Injury to worker        HIGH      4     Flash back arresters will be fitted to all oxy-acetylene equipment. Within 12 months of valid test.                M         Site Management
                                                                                                                                                                                           Contract Partner
                      Fire                    HIGH      5     Fires watch person will be used at any time where hot works are carried out. This watch is to continue at          M         Site Management
                                                              least 60mins after work has ceased before permit can be signed off.                                                          Contract Partner
                      Damage to
                      property                                A suitable fire extinguisher will be provided in proximity where welding/hot work processes are carried
                                                              out on site.




                                                                                                                                               Project Hazard/Risk Assessment / Page 32 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.