STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 275, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Exposure to HIGH 5 Signs will be erected to indicate welding areas and associated hazards. L Site Management
welding product Contract Partner
fumes and
atmospheres
Mechanical HIGH 3 Where UV radiation is produced from welding activities, screens will be used to isolate welding activities L Site Management
hazards and workers who are not carrying out the welding will not be permitted in the welding area. Contract Partner
Electrical hazards HIGH 4 Additional ventilation will be provided where required. M Site Management
Contract Partner
Fire HIGH 5 Controls (such as positioning catch mats, fire blankets and boards) will be implemented to prevent hot M Site Management
slag, molten metal or sparks falling between levels of the construction. Contract Partner
Fire HIGH 5 Any elevated hot work should have underlying fire watcher/s and fire blankets M Contract Partner
provided under the hot work. Site Manager
Fire HIGH 1 All materials that may be combustible or flammable (including chemicals) will be removed from the hot M Site Management
work area before work commences. This must be a radius of 11m. Contract Partner
Fire HIGH 5 Gas cylinders onsite will: M Site Management
Contract Partner
Explosion - be stored vertically.
- be adequately restrained and secured against movement.
- have full cylinders are segregated from empty cylinders.
- have fuel gases are segregated from oxygen (e.g., acetylene and oxygen)
- have signage, such as “No Smoking or Naked Lights” is displayed where fuel gases are stored
7.6 Works in Isolated Conditions
Planning for works in Activity planning EXTREME 5 Task specific SWMS to be developed for the activity. Approved SWMS to outline a check-in procedure to L Site Management
isolated conditions and hazard be followed to ensure that the worker is regularly contacted during the time that they are in the isolated HSE Advisor with BSBWHS414 OHS
identification location. The EPARP to be referenced in the creation of this SWMS. Cert 4
Project Hazard/Risk Assessment / Page 33 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.