STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 277, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Excessive noise HIGH 5 Clearly legible sign(s) will be placed in the vicinity where there are explosive power tools being used M Site Management
levels to warn other workers of the work being undertaken on site. Contract Partner
Flying particles /
materials
Injury
Workers not HIGH 5 Every explosive powered handheld fastening tool will be: M Site Management
suitably licenced or Contract Partner
a) completely overhauled by the manufacturer or their authorised agent at least once in each 12-
trained for the month period.
activity.
b) cleaned at least once daily when in use; and
Injury
c) Inspected by a competent person before each use.
Tool faults
Workers not HIGH 5 Every explosive powered handheld fastening tool will be: M Site Management
suitably licenced or Contract Partner
d) completely overhauled by the manufacturer or their authorised agent at least once in each 12-
trained for the month period.
activity.
e) cleaned at least once daily when in use; and
Injury
f) Inspected by a competent person before each use.
Tool faults
7.9 Biological Hazards
Planning for construction Exposure to HIGH 5 Consult with client of any possible risk prior to commencing works. L Project Team
activities Biological hazards HSE Team
which include – HIGH 6 Where possible risks are identified engage a qualified and formally trained occupation hygienist to assess L Site Management
the risk and provide a mitigation strategy. Contract Partner’s
- Mould
Visitors
- Hepatitis Formally trained occupation
- Covid 19 hygienist
- Influenza HIGH 5 Health monitoring to be implemented where if identified by occupational hygienist and in line with the M Site Management
WC Health monitoring Program. Contract Partner’s
- Insect stings and
bites Formally trained occupation
hygienist
Project Hazard/Risk Assessment / Page 35 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)