Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 276, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Worker injured or EXTREME 5 Where a worker is required to work alone or in an isolated situation, a risk assessment shall be M Site Management
incapacitated completed assessing the following risks: HSE Advisor with BSBWHS414 OHS
Cert 4
- length of time the person needs to complete the job.
- evacuation procedure
- time of day
- communication procedure during the work
- communication procedure during an emergency
- location of the work
- nature of the work
- skills and capability of the worker
7.7 Portable Power Tools
Planning Activity planning HIGH 5 All tasks involving powered tools will have an approved SWMS or SOP in place which considers the job L Site Management
and hazard steps and task hazards. following hazards: Contract Partner
identification Only competent persons are permitted to operate portable electrical tools on-site
Exposure to HIGH 6 Appropriate PPE will be used whilst undertaking tasks involving portable power tools. L Site Management
excessive noise Contract Partner
Use of electrical equipment Injury HIGH 5 All tools will be used in accordance with the manufacturer’s specifications. L Site Management
Contract Partner
Injury HIGH 1 Compressed air should never be directed toward the body as this can lead to serious injury or death. L Site Management
Contract Partner
7.8 Explosive Power Tools
Use of electrical equipment Workers not HIGH 5 Explosive power tools will be always stored in a securely locked container when not in use and will M Site Management
suitably licenced or not be removed from container unless for use, repair or maintenance or left unattended unless Contract Partner
trained for the precautions are taken to ensure that it will not come into the possession of an unauthorised person.
activity
Excessive noise HIGH 3 When using explosive power tools barricading will be used where the risk of other personnel M Site Management
levels entering the area is considered “HIGH.” This barricading is to isolate the work area where the Contract Partner
Flying particles / explosive power tool is being used and shall be erected in all directions.
materials
Injury
Project Hazard/Risk Assessment / Page 34 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.