Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 282, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
HIGH 6 Where possible provide ventilation to area ensuring you are not moving contaminated air to another Site Management
inhabited area. Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 Ensure ventilated bunded areas are available to store materials that may emit harmful vapours. Site Management
Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 If flammable, ensure no naked flames are present and firefighting equipment is available in the immediate Site Management
area of storage and use. Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 Continue air / atmospheric monitoring throughout the activity at interval identified by the occupational Site Management
hygienist. Contract Partner’s
Formally trained Occupation
hygienist
HSE Advisor with BSBWHS414 OHS
Cert 4
Planning for construction Vapours of Risk – HIGH 5 Identify any possible exposure risks prior to work commencing during project prestart meeting. HSE team Project Team
activities – Vapours to be involved in meeting. Site Manager
- Solvents HSE Advisor with BSBWHS414 OHS
- Fuel Products Cert 4 with BSBWHS414 OHS Cert 4
- Paint HIGH 5 Where possible risks are identified which don’t have suitable controls in place. Engage a qualified and Site Management
formally trained occupation hygienist to assess the risk and provide a mitigation strategy. Contract Partner’s
Visitors
Formally trained occupation
hygienist
HIGH 5 Health monitoring to be implemented where if identified by occupational hygienist and in line with the Site Management
WC Health monitoring Program. Contract Partner’s
Formally trained occupation
hygienist
Project Hazard/Risk Assessment / Page 40 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.