Residual
Rating
Initial
Proposed Controls
Risk
Risk
Activity Hazard Responsible Person
HOC
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
HIGH 6 Ensure correct PPE and RPE is identified and confirmed acceptable by an occupational hygienist or Site Management
suitable trained person. Contract Partner’s
Visitors
Formally trained Occupation
hygienist
HSE Advisor with BSBWHS414 OHS
Cert 4
HIGH 5 A SWMS must be developed clearly identify the controls required for the activity and directions identified Site Management
by a formally trained Occupational Hygienist. Ensure this includes air monitoring and all other specific Contract Partner’s
equipment and PPE identified in the Hygienists assessment. Formally trained Occupation
hygienist
HIGH 5 Review SDS information if available or applicable Site Management
Contract Partner’s
Formally trained Occupation
hygienist
HIGH 6 Ensure emergency responses have been considered and are in line with the EPARP for the project. Project Team
Site Manager
HSE Advisor with BSBWHS414 OHS
Cert 4 with BSBWHS414 OHS Cert 4
During works – Vapours Vapours of Risk – HIGH 5 Ensure SWMS are strictly adhered to and identify any controls required Site Management
Contract Partner
- Solvents HSE Advisor with BSBWHS414 OHS
- Fuel products. Cert 4
- Paints
HIGH 6 PPE and RPE is always worn whilst performing activities that have risk potential. Site Management
Contract Partner
HSE Advisor with BSBWHS414 OHS
Cert 4
Project Hazard/Risk Assessment / Page 41 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.