Original PDF page 291, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Planning for lead Exposure to lead HIGH 5 The Removal of Lead Materials Checklist will be completed prior to the removal of lead. M Site Management
process works Site Management
Environmental HIGH 5 Controls will be to prevent lead contamination of the workplace and amenities. M
contamination
Lead process Exposure to lead HIGH 3 Non-required persons will be excluded from lead removal areas. M Site Management
Exposure to lead HIGH 3 Barriers and signage will be erected to delineate lead removal areas. M Contract Partner
Exposure to lead HIGH 5 Atmospheric monitoring will be conducted where required by the lead risk assessment. M Site Management Contract
Partner
Exposure to lead HIGH 5 The lead removal area will be kept as clean as possible. Site Management Contract
Partner
Environmental HIGH 1 Compressed air (or other compressed gas) or dry sweeping will not be used to clean the lead removal area. Site Management Contract
contamination Partner
Exposure to lead HIGH 1 No person is to eat, chew gum, smoke or carry anything used for smoking in the lead removal area. Site Management Contract
Partner
Clean up Exposure to lead HIGH 3 Before moving from the lead removal area to any area used for eating and drinking workers will remove clothing and Site Management Contract
equipment contaminated with lead and wash their forearms, hands and face. Partner
Health monitoring Health impacts EXTREME 5 Where Woollam direct employees are undertaking activities exposing them implemented to hazardous substances Site Management Contract
health surveillance / monitoring as required by relevant legislation will be undertaken, or those identified as significant Partner
risk to a worker’s health through the Hazardous Substance Risk Assessment. Procedure is outlined in the Woollam 0011- HSE Advisor with
Health Monitoring Program. BSBWHS414 OHS Cert 4
Occupation Hygienist.
Health impacts EXTREME 5 Health surveillance / monitoring information / reports will be provided to workers. Site Management Contract
Partner
HSE Advisor with
BSBWHS414 OHS Cert 4
Occupation Hygienist.
Health impacts EXTREME 5 Actions will be taken based on the results of the health surveillance / monitoring. And the recommendation of a medical Site Management Contract
professional and or Occupation Hygienist. Partner
HSE Advisor with
BSBWHS414 OHS Cert 4
Occupation Hygienist.
8.3 Respirable Crystalline Silica Dust (RCS)
Project Hazard/Risk Assessment / Page 49 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.