Original PDF page 292, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                              Residual
                                          Rating
                                          Initial
                                                                                                                  Proposed Controls




                                                        HOC
                                           Risk




                                                                                                                                                                                                Risk
      Activity            Hazards                                                                                                                                                                           Responsible Person
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)

Planning for works   Activity planning    HIGH          5     Prior to the commencement of works that generate or agitate Respirable or Crystalline Silica Dust (RCS), an approved                       Site Management Contract
involving RCS        and hazard                               SWMS with suitable controls is to be provided to the site team.                                                                            Partner
                     identification                                                                                                                                                                      HSE Advisor

                     Worker exposure      HIGH          5     RCS work processes should be done outdoors away from other workers where possible.                                                         Site Management Contract
                                                                                                                                                                                                         Partner
                                                              Indoors, separate the RCS work processes from other work activities where possible.                                                        HSE Advisor
                     Worker and visitor   HIGH          4     Dedicated areas with barricades and signage are to be established where cutting, drilling, grinding, mixing and scraping                   Site Management Contract
                     exposure                                 RCS is likely to be generated or agitated.                                                                                                 Partner
                                                              These dedicated areas are to be:
                                                              - Segregated from other work areas & amenities.
                                                              - Mechanical ventilation and approved filtration
                                                              - With a bin near to dispose of waste
                     Worker Exposure      HIGH      4         - Plan PPE as per MPF requirements identified in RCS COP.




                                                                                                                                                      Project Hazard/Risk Assessment / Page 50 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.