Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 294, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                        Residual
                                      Rating
                                      Initial
                                                                                                            Proposed Controls




                                                HOC
                                       Risk




                                                                                                                                                                                          Risk
      Activity        Hazards                                                                                                                                                                         Responsible Person
                                                                                (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)

                  Health impacts   EXTREME      5     Health surveillance / monitoring information / reports will be provided to workers.                                                          Site Management Contract
                                                                                                                                                                                                   Partner
                                                                                                                                                                                                   HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert 4
                                                                                                                                                                                                   Occupation Hygienist.

                  Health impacts   EXTREME      5     Actions will be taken based on the results of the health surveillance / monitoring. And the recommendation of a                              Site Management Contract
                                                      medical professional and or Occupation Hygienist.                                                                                            Partner
                                                                                                                                                                                                   HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert 4
                                                                                                                                                                                                   Occupation Hygienist.

                  Health impacts   Extreme      5     RPE Usage Record to be completed prior to any work possibly exposing a worker to RCS any more than 30 days with                              Site Management Contract
                                                      365 days recorded will trigger health monitoring.                                                                                            Partner
                                                                                                                                                                                                   HSE Advisor with
                                                                                                                                                                                                   BSBWHS414 OHS Cert 4



     8.4         Medium Density Fibreboard (MDF)
Planning works    Dust exposure.   EXTREME      2     Use alternative material in place of MDF.                                                                                                    Site Management Contract
                                                                                                                                                                                                   Partner
                  Health impacts

                  Dust exposure.   EXTREME      1     Where an alternative is not available, cut MDF offsite.                                                                                      Site Management Contract
                                                                                                                                                                                                   Partner
                  Health impacts

                  Dust exposure.   EXTREME      5     Prior to works that generate MDF dust airborne dust an approved SWMS with suitable controls is to be in place and                            Site Management Contract
                                                      communicated to all workers involved with the task generating MDF dust.                                                                      Partner
                  Health impacts

                  Dust exposure.   EXTREME      5     Identify materials to be installed with MDF. Where a task has been identified with MDF with a risk to exposure of                            Site Management Contract
                                                      airborne MDF dust, all PCBU are to review their relevant SWMS and ensure all controls are in place.                                          Partner
                  Health impacts

Works with MDF    Dust exposure.   EXTREME      4     Cut, drill, or agitate MDF in dedicated cutting room where airborne MDF is generated or agitated.                                            Site Management Contract
                                                                                                                                                                                                   Partner
                  Health impacts                          The dedicated cutting room is to be:
                                                      -     Excluded from other workers not involved in the task and communicated to all workers.
                                                      -     Signage for the exclusion zone.
                                                      -     Be completely sealed with no openings.
                                                      -     Door on entrance which remains closed.




                                                                                                                                                Project Hazard/Risk Assessment / Page 52 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.