STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 295, section 1. The text section number identifies this passage in the reader.
Residual
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Dust exposure. EXTREME 3 Where practical an engineered control is to be implemented to reduce or eliminate as far as reasonably practicable MDF Site Management Contract
dust exposure to the acceptable national exposure limit. These controls include: Partner
Health impacts
- Extraction / vacuums
- Tool attachments (shrouds / drill pieces etc.)
- Air scrubbers/mechanical extraction.
Dust exposure. EXTREME 6 Those personnel involved in cutting, drilling, planning where an exposure to dust exists must wear suitable respiratory Site Management Contract
protective equipment for the task and receive adequate training in its use and application. Partner
Health impacts
All Personnel are to wear eye protection PPE.
Dust exposure. EXTREME 5 Cutting room cleaning activities that may expose a worker: Site Management Contract
Partner
Health impacts - Avoid blowing, areas.
- Suitable vacuum/extraction method to be utilised.
- Room to be cleaned regularly daily.
- Room to be cleaned prior to other workers entering the room.
- Disposal of dust to be bagged.
- Promote good personnel hygiene.
Dust exposure. EXTREME 5 Predrill holes in MDF material in cutting room. Site Management Contract
Partner
Health impacts
Dust exposure. EXTREME 5 All personnel are to be managed to ensure no personnel exceed national exposure limit for formaldehyde. Site Management Contract
Partner
Health impacts
8.5 Hazardous Chemicals (as defined under Schedule 14 WHS Reg 2011)
Planning and training Activity planning MEDIUM 5 All tasks involving Hazardous Substances / Dangerous Goods will have an approved SWMS in place which addresses the Site Management Contract
and hazard activity and task hazards. Partner
identification
Project Hazard/Risk Assessment / Page 53 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.