Skip to the record
The gold standard in government transparency.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 328, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                         Residual
                                                                                                            Proposed Controls




                                   Rating
                                   Initial




                                                 HOC
                                    Risk




                                                                                                                                                                                           Risk
Activity          Risks                                                                                                                                                                             Responsible Person
                                                                                 (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)


                                             5         Authorised electrical spotter to be used

           Collision with        HIGH        5         Where cranes are to be erected in flight paths the specific requirements of CASA will be met.                                                Site Management
           other cranes /
           structures

           Activity planning     EXTREME     5         All tasks involving mobile crane activities will have an approved SWMS in place.                                                             Site Management
           and hazard
           identification

           Workers not           EXTREME     1         Only licenced operators to undertake crane operations and such licenced must be sighted at induction.                                        Site Management
           trained / licenced
           in the activity

           Plant not suitable    HIGH        5         Mobile Plant Checklist to be completed prior to use on site.                                                                                 Site Management
           for use

           Crane collapse /      EXTREME     5         All cranes on site will be operated in accordance with the manufacturer’s recommendations and requirements and these                         Site Management
           overturn /                                  requirements must be reflected in the health and safety documentation submitted. If in doubt, the crane will not be
           collision with                              operated until specific requirements have been determined to ensure safe operation.
           other structures /
           work near                                   Under no circumstances are crane to work outside manufacturer’s specifications or COP instruction
           overhead
           powerlines

           Plant not suitable    EXTREME     5         Daily inspections will be undertaken, and results of these inspections will be entered into the logbook.                                     Site Management
           for use

           People                EXTREME     3         Use of barricading to establish exclusion zones around crane set up will be implemented and controlled by the dogman.                        Site Management
           interaction in
           installation area
           resulting in injury

           Collision with        EXTREME     3         For lifting of concrete panels, a designated crane travel path shall be established, and the area will be excluded from                      Site Management
           other cranes /                              workers together with the panel placement area.
           structures




                                                                                                                                       Project Hazard/Risk Assessment / Page 86 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.