Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
5 Authorised electrical spotter to be used
Collision with HIGH 5 Where cranes are to be erected in flight paths the specific requirements of CASA will be met. Site Management
other cranes /
structures
Activity planning EXTREME 5 All tasks involving mobile crane activities will have an approved SWMS in place. Site Management
and hazard
identification
Workers not EXTREME 1 Only licenced operators to undertake crane operations and such licenced must be sighted at induction. Site Management
trained / licenced
in the activity
Plant not suitable HIGH 5 Mobile Plant Checklist to be completed prior to use on site. Site Management
for use
Crane collapse / EXTREME 5 All cranes on site will be operated in accordance with the manufacturer’s recommendations and requirements and these Site Management
overturn / requirements must be reflected in the health and safety documentation submitted. If in doubt, the crane will not be
collision with operated until specific requirements have been determined to ensure safe operation.
other structures /
work near Under no circumstances are crane to work outside manufacturer’s specifications or COP instruction
overhead
powerlines
Plant not suitable EXTREME 5 Daily inspections will be undertaken, and results of these inspections will be entered into the logbook. Site Management
for use
People EXTREME 3 Use of barricading to establish exclusion zones around crane set up will be implemented and controlled by the dogman. Site Management
interaction in
installation area
resulting in injury
Collision with EXTREME 3 For lifting of concrete panels, a designated crane travel path shall be established, and the area will be excluded from Site Management
other cranes / workers together with the panel placement area.
structures
Project Hazard/Risk Assessment / Page 86 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.