STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 327, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                         Residual
                                                                                                            Proposed Controls




                                  Rating
                                  Initial




                                                HOC
                                   Risk




                                                                                                                                                                                           Risk
Activity         Risks                                                                                                                                                                              Responsible Person
                                                                                 (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)


                                                      any foreseeable operating conditions to Woollam

           Crane instability /   EXTREME    5         Woollam will provide to the crane supplier documented information about the ground bearing pressure from a geo-                               Site Management
           overturn                                   technical engineer where a mobile crane is to perform any of the following lifts:
                                                      bridge beams.
                                                      tilt-up panels; and / or
                                                      Any other heavy lift where the load is 50 tonnes or more.

           Crane collapse /      EXTREME    5         Comprehensive documented lifting procedures are required in the following situations:                                                         Site Management
           overturn /
           collision with                             tilt-up panel.                                                                                                                                Contract Partner
           other structures /                         multiple crane lifts, where more than one crane is used to lift a load at any one time.
           work near
           overhead                                   lifting of workboxes with persons in the boxes
           powerlines
                                                      installation of bridge beams during bridge installation work
                                                      working near live overhead powerlines
                                                      lifting large pressure vessels or tanks
                                                      the use of mobile cranes on barges
                                                      erection of tower cranes
                                                      heavy lifts where the load is 50 tonnes or more

           Plant not suitable    EXTREME    5         The following must be provided before a crane may be used on site:                                                                            Site Management
           for use
                                                      Evidence that all crane attachments & lifting gear have been tested and tagged and in a serviceable condition for use on
                                                      site.
                                                      Manuals for operation, servicing and maintenance are available and kept on the crane.
                                                      Full details of all inspections, repairs and maintenance are to be supplied and to be recorded in a logbook kept with the
                                                      crane.

           Contact with          EXTREME              Where there is a risk of contact with power lines:                                                                                            Project
           powerlines.                                                                                                                                                                              Management
                                            3         The power lines will be de-energised and written confirmation of isolation provided by electrical entity; or
                                                                                                                                                                                                    Site Management
                                                      Exclusion zones will be maintained and adhered to and



                                                                                                                                       Project Hazard/Risk Assessment / Page 85 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.