Original PDF page 327, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
any foreseeable operating conditions to Woollam
Crane instability / EXTREME 5 Woollam will provide to the crane supplier documented information about the ground bearing pressure from a geo- Site Management
overturn technical engineer where a mobile crane is to perform any of the following lifts:
bridge beams.
tilt-up panels; and / or
Any other heavy lift where the load is 50 tonnes or more.
Crane collapse / EXTREME 5 Comprehensive documented lifting procedures are required in the following situations: Site Management
overturn /
collision with tilt-up panel. Contract Partner
other structures / multiple crane lifts, where more than one crane is used to lift a load at any one time.
work near
overhead lifting of workboxes with persons in the boxes
powerlines
installation of bridge beams during bridge installation work
working near live overhead powerlines
lifting large pressure vessels or tanks
the use of mobile cranes on barges
erection of tower cranes
heavy lifts where the load is 50 tonnes or more
Plant not suitable EXTREME 5 The following must be provided before a crane may be used on site: Site Management
for use
Evidence that all crane attachments & lifting gear have been tested and tagged and in a serviceable condition for use on
site.
Manuals for operation, servicing and maintenance are available and kept on the crane.
Full details of all inspections, repairs and maintenance are to be supplied and to be recorded in a logbook kept with the
crane.
Contact with EXTREME Where there is a risk of contact with power lines: Project
powerlines. Management
3 The power lines will be de-energised and written confirmation of isolation provided by electrical entity; or
Site Management
Exclusion zones will be maintained and adhered to and
Project Hazard/Risk Assessment / Page 85 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.