STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 331, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Swing stage HIGH 5 Prior to placement, erection, use and dismantling of a swing stage on site Woollam will complete the Woollam Scaffold Site Management
collapse Inspection Checklist on Procore.
Faulty plant HIGH 5 Swing stage contractor/supplier will provide documentation (signed by a qualified engineer), to verify the swing stage Site Management
components meet the manufacturer’s specifications in addition to all other relevant documents / sign offs as identified
within the Principal Contractor or Building Owner Swing-stage Statement. Contract Partner
Engineer
Activity planning HIGH 5 Site-specific High-Risk SWMS on the safe set up, erection, servicing and dismantling of the swing stage will be obtained Site Management
and hazard from swing stage contractor/supplier.
identification Contract Partner
Training and HIGH 5 Swing stage contractor/supplier will provide: Site Management
instruction
Training of workers in the safe operation and retrieval procedures to use the swing stage – records of training and Contract Partner
attendees shall be maintained.
Training of workers in the Daily Inspection Checklist required to be action and completed prior to using the swing stage –
supplier to provide checklist and logbook.
Training of workers to inspect the Rostrum set-up and enclosure prior to use of swing stage
Training and HIGH 5 Only an advanced rigger or advanced scaffolder (under the national certification system) who is competent in the Site Management
instruction installation of swing stage systems is to install suspended scaffolds.
Contract Partner
Falls from height. HIGH 5 For relocation of the swing-stage suspension system a verification statement will be completed and signed by the Installer
installer and issued to Woollam.
Falling objects Supplier
Site Management
Swing stage HIGH 5 If the system is reinstalled and the reinstallation is different to that which was originally verified by the engineer, the Site Management
collapse Principal Contractor or Building Owner Swing-stage Statement and associated processes and documentation will be
completed.
Swing stage HIGH 5 A load test conducted in accordance with the Swing-stage Load Test Procedure will be undertaken for each installation of Installer
collapse a swing stage system.
Supplier
Site Management
Project Hazard/Risk Assessment / Page 89 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.