Original PDF page 332, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risks Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Use Swing stage HIGH 5 The Safe Working Load (SWL) will be clearly marked on the cradle of the suspended scaffold and the limit will not be Installer / Supplier
collapse exceeded.
Site Management
Swing stage HIGH 4 Materials will be evenly distributed and not concentrated in one area. Contract Partner
collapse
Swing stage HIGH 5 Swing-stage operators will verify the mass of the load to be included in the cradle prior to use. Contract Partner
collapse.
Falling objects
Plant malfunction HIGH 4 All electric scaffold hoists will have a device to limit the lifting capacity of the hoist to a maximum of 1.25 times the rating Installer
of the hoist.
Supplier
Site Management
Collapse or HIGH 5 Inspection and maintenance of the swing stage will be undertaken in accordance with the manufacturers / engineers / Site Management
malfunction of competent persons recommendations and inspected at least:
the plant Contract Partner
before first use
prior to each day’s use
immediately following any disturbance or major weather impact that might reasonably be expected to affect the stability
of the scaffold or supporting structure.
following any repairs and modifications; and
At intervals not exceeding thirty (30) days.
Swing stage inspection and maintenance records will be obtained from the installer to ensure currency.
Fall from heights EXTREME 6 Persons located in swing stage cradles will wear fall arrest harnesses attached to a properly designed anchorage system Contract Partner
or where a fall is not possible, a travel restraint system attached to a static line in the cradle will be used.
Falling objects HIGH 6 Swing stage users are to use tool restraints / lanyards to prevent tools and equipment from falling from the swing stage. Contract Partner
Falling objects HIGH 5 Exclusion zone for areas where swing stage is set up and areas below. Site Management
Project Hazard/Risk Assessment / Page 90 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.