14. Temporary Fixed Plant
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
14.1 Gantry
Planning stage Unknown EXTREME Dilapidation report and services report to be completed prior to installation of gantries, access to services (i.e., water, sewer access Project
ground points) to be maintained and free of obstructions Management
conditions
Collapse EXTREME Gantry to be engineered and handed over as per engineer instructions. Only approved hoardings and loads to be applied. Gantry supplier /
installer
Installation Activity planning EXTREME Tasks involving installation of gantries to have an approved SWMS in place. Site Management
and hazard Contract Partner
identification
Use Public protection HIGH Trip hazards and any protruding objects are to be adequately protected. Site Management
controls not Lighting through gantries to be installed and maintained – refer Electrical - Lighting section
implemented
Review and Safety Interactions, Task Observations, Weekly HSE Inspection, Monthly Audit as per Procore Inspection matrix
Monitoring
14.2 Scaffold
Planning / design Scaffold collapse EXTREME 3 A scaffold plan / design is to be prepared for scaffolding work above four metres (measured from the top working platform (TWP) Site Management
of scaffold to the ground) by a competent person. Scaffold Designer
Modular scaffold designs are to be verified by a suitably qualified engineer.
All scaffolds should be built in accordance with the relevant Australian Standard, structures constructed on site should reflect
what is in the scaffold plan.
Scaffold plans must remain available on site for the duration of the work.
QLD Code of Practice requires that Scaffold Plans will include details on live load limits per bay, bracing, edge protection, supports,
ties, access, and egress etc.
Project Hazard/Risk Assessment / Page 92 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.