Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Scaffold collapse EXTREME 5 Scaffold bay live load limits are to be confirmed by scaffold design and maintained within the maximum live load limit per bay (a Site Management
scaffold bay includes all scaffold decks from ground to top working platform). Contract Partner
Maximum live load limit guidelines are inclusive of worker, materials, and equipment.
All scaffold plans are to clearly indicate maximum live load limits per bay.
Scaffold collapse HIGH 3 Where equipment is supported, suspended, anchored or tied to an existing structure the site team must ensure that the structure Project
is adequate to safely support the additional imposed load indicated in the approved Scaffold Design. Management
Site Management
Scaffold Collapse HIGH 3 Scaffold must have an appropriate design that has been produced in conjunction with the appropriately qualified person with a
preference to always use an RPEQ Engineer in the process. See below for requirements outlined in the 2021 Scaffolding COP.
Project Hazard/Risk Assessment / Page 93 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.