STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 340, section 1. The text section number identifies this passage in the reader.
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Authorised electrical spotter to be used
Collision with EXTREME 5 Site Management
Where cranes are to be erected in flight paths the specific requirements of CASA will be met.
aircraft
Activity planning EXTREME 5 All tasks involving crane activities will have an approved SWMS in place. Site Management
and hazard
identification
Training and EXTREME 5 Only licenced operators to undertake crane operate and licenced must be sighted at induction. Site Management
instruction
Collision with EXTREME 5 All cranes on site will be operated in accordance with the manufacturer’s recommendations and requirements and these Site Management
other cranes / requirements must be reflected in the documentation submitted. If in doubt, the crane will not be erected or operated until
structures specific requirements have been determined to ensure safe operation.
Emergency EXTREME 5 For all emergency response & retrieval plans utilising the crane all workers involved must be inducted into the content of the Site Management
response process Emergency Response Plan (i.e. jump from retrieval, use of man box etc.) Contract Partner
Crane Incorrect EXTREME 5 The records of the pre-erection inspections and tests and commissioning reports must be provided to Woollam prior to the use of a Contract Partner
Commissioning commissioning / crane onsite.
faults not
detected
Use of tower Structural or EXTREME 5 Daily inspections will be undertaken, and results of these inspections will be entered into the logbook. Site Management
crane mechanical
failure
Structural or EXTREME 5 Under no circumstances are cranes to work outside manufacturer’s specifications or COP instruction. Site Management
mechanical Contract Partner
failure
Failure of EXTREME 5 A maintenance register will be updated every 3 months. Crane supplier
equipment /
attachments
Structural or
mechanical
failure
Falling objects EXTREME 4 Crane Contract
Unattended tower cranes must: Partner
- loads removed from the hook.
- hook stowed.
- free slew radius
Project Hazard/Risk Assessment / Page 98 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.