Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Review and Safety Interaction, Task Observation, Monthly Audit, Scaffold Inspection as per Procore Inspection Matrix.
Mentoring
14.3 Tower Crane
Planning for the Structural, EXTREME 5 Site Management
Erection of Tower Crane Checklist on Procore shall be completed, and all relevant associated documents retained on site. Crane
installation of a mechanical or commissioning documentation to be retained on site along with all Crane safe inspections (initial and annual thereafter).
tower crane attachment
failure
Crane collapse EXTREME 5 Site Manager
The following evidence maintained on site: HSE Advisor
- Tower crane design registration. Contract Partner
- Tower crane registration.
- Certification of the base design by an engineer and the inspection requirements prior to pouring.
- 10-year inspection certification
- The area around the crane is suitably barricaded off during erection.
- Full details of the procedures for operation of the tower crane.
- Load charts, in English, fixed in the operator’s cabin in a visible location (with stability information for mobile cranes).
- Certification that the following items meet the required safety standards:
• Tower bolts, tower to building ties, bracing, and bolting (NDT Testing)
• Access ladders, platforms, and guardrails
• Cleanliness of towers and crane generally
• Condition of ropes and sheaves
• Checking limits and safety devices
• Correct load radius indicator, Hook height indicator, Load weight indicator, motion limiting devices, rated capacity
limiters.
• Wind speed indicator, audible warning devices.
• Letter of acceptance for the crane installation and tower to building ties where applicable
• Completion of log sheets
• Operation of load limiting device (AML – automatic load limiter)
Falling objects EXTREME Where there is a risk of contact with power lines: Project
3 Management
- The power lines will be de-energised and written confirmation of isolation provided by electrical entity; or Site Management
5 - Exclusion zones will be maintained and adhered to
Project Hazard/Risk Assessment / Page 97 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.