Skip to the record
The only place to find full transcripts.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 342, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                    Residual
                                                                                                                                                                                                                 Responsible




                                       Rating
                                       Initial
                                                                                                                  Proposed Controls




                                                 HOC
                                        Risk




                                                                                                                                                                                                      Risk
      Activity         Risks
                                                                                     (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                               Person
                                                       - Installed by a competent person
Use of loading   Manual              EXTREME     5     Loading bays pushed out/pulled in under the supervision of riggers/crane crew. Loading bays are to be left in the pulled in position                    Site Management
bays             handling                              when not in use.                                                                                                                                        Contract Partner

                 Overload            EXTREME     5     Loads are not to exceed the SWL of Loading bays. Materials are not to be left of the loading bays.                                                      Site Management
                                                                                                                                                                                                               Contract Partner
                                                       Designated loading areas are to be marked / signed appropriately

                 Falling objects     EXTREME     5     Any live edge works during installation or removal are to have controls in place to prevent person falling from height or falling                       Site Management
                                                       objects. Exclusion zones are to be signed and barricaded below the area the loading bay is being installed or removed.                                  Contract Partner
                 Falls from height

                 Falling objects     EXTREME     5     Loose objects are to be removed from the loading bay                                                                                                    Site Management
                                                                                                                                                                                                               Contract Partner
                 Falling objects     EXTREME     5     Loading bays are to inspection prior to install/removal to ensure all the components are secure and has no damage.                                      Site Management
                                                                                                                                                                                                               Contract Partner

      14.5       Hoists
Planning         Collapse              HIGH      5     Engineer drawings for hoist to be designed by an engineer and provided to Woollam prior to erection.                                                    Site Management
                                                                                                                                                                                                               Contract Partner
                 Hoist                 HIGH      5     A commissioning report must be provided to the Site Management Team by a competent person certifying that the hoist is safe for                         Site Management
                 malfunction.                          common use before the hoist may be used onsite.                                                                                                         Contract Partner
                 Hoist electrical
                 failure

                 Activity planning     HIGH      5     Hoist contractor/supplier to provide Safety Plan and SWMS on the safe set up, erection, servicing and dismantling of the hoist.                         Site Management
                 and hazard                                                                                                                                                                                    Contract Partner
                 identification

                 Training              HIGH      5     Evidence of the operator’s licence will be provided to Woollam                                                                                          Site Management

                 Operator              HIGH      5     Any operators must hold the appropriate licence and be competent to operate the height and type of hoist installed.                                     Site Management
                 licencing                                                                                                                                                                                          Operator

Use              Hoist                 HIGH      5     All services and repairs carried out on the hoist are to be carried out by competent persons and all records recorded in the hoist                      Site Management
                 malfunction.                          logbook.                                                                                                                                                Contract Partner
                 Operator
                 competency

                 Hoist                 HIGH      5     In the event of impending inclement weather, a risk assessment shall be conducted to determine suitable work activities.                                Site Management
                 malfunction
                                                                                                                                                                                                               Contract Partner
                 Hoist                 HIGH      5     Daily prestart for the man/material hoist shall be completed and recorded in the logbook.                                                               Site Management
                 malfunction.                                                                                                                                                                                  Contract Partner


                                                                                                                                                 Project Hazard/Risk Assessment / Page 100 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.