Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Risks
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Hoist electrical
failure
Hoist HIGH 5 Materials and personnel loaded into the man/material hoist is not to exceed the SWL. Site Management
malfunction Contract Partner
Worker HIGH 5 When jumping man/material mast, doors, posts of a dual car hoist, both cars are to be taken out of service. Site Management
interaction Contract Partner
Falling objects HIGH 5 Gaps in hoist doors to be covered to stop falling objects. Site Management
Contract Partner
14.6 Mast Climber
Planning Mast collapse EXTREME 5 A review of the profile of the building will be carried out to ensure the safe installation and operation of the mast climber when Site Management
attached to the building Supplier
Mast climber EXTREME 5 The electrical power supply required to safely operate the mast climber is to be reviewed, provided, and installed by a licensed Site Management
electrical failure electrician Contract Partner
Activity planning EXTREME 5 Mast Climber contractor/supplier to provide a Safety Plan and SWMS on the safe set up, erection, servicing and dismantling of the Site Management
and hazard Mast Climber Contract Partner
identification
Mast collapse EXTREME 5 Mast Climber supplier to provide an engineer’s drawing to verify the layout of the platform to be used, spacing, fixing method and Site Management
type of mast ties to be used in the securing of the mast climber to the structure Contract Partner
Mast collapse EXTREME 5 A commissioning report must be provided to the Site Manager/Foreman by a competent person certifying that the mast climber Site Management
has been installed as per the engineer’s drawings and is safe for common use before the mast climber may be used onsite. Contract Partner
Use Injury to worker EXTREME 5 Operators of the mast climber must be trained in the safe operation of the mast climber by a competent person provided by the Site Management
from incorrect supplier of the mast climber – provide records to the Site Manager/Foreman Contract Partner
use of mast
climber
Mast failure EXTREME 5 All pre-start checklist and safe operational checks must to be carried out by the trained operator at the start of each day – records Site Management
to be kept on site Contract Partner
Mast collapse
Mast failure EXTREME 5 All services and repairs carried out on the mast climber are to be carried out by a competent person/s and all records recorded in Site Management
the mast climber logbook Contract Partner
Mast collapse
Falling objects EXTREME 5 Exclusion zone with signage and barricading to be in place for the area below where the mast climber is operating. Site Management
Contract Partner
Falling objects EXTREME 6 Use of lanyards on tools and equipment. Contract Partner
Project Hazard/Risk Assessment / Page 101 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.