Skip to the record
Beware of cheap imitations.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 346, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                            Residual
                                                                                                                                                                                                         Responsible




                                          Rating
                                          Initial
                                                                                                                Proposed Controls




                                                    HOC
                                           Risk




                                                                                                                                                                                              Risk
     Activity           Hazards
                                                                                   (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                         Person

                Falling objects         EXTREME     4     Penetrations 100mm and over are to be adequately covered to prevent trips and spills hazards and to ensure that objects                      Site Management
                                                          do not fall to the level below.                                                                                                              Contract Partner
                Slips / trips

                Fall from heights.      EXTREME     5     Vertical penetrations must be fully enclosed with mesh as a minimum standard. The mesh should have a small aperture,                         Site Management
                                                          50mm x 50mm mesh size or smaller and be capable of withstanding the potential imposed load.                                                  Contract Partner
                Falling objects
                                                          Where a ply cover is used for vertical penetration, it shall be marked with signage “Danger Penetration Behind”.

                Fall from heights.      EXTREME     5     Where ply covers are used for penetrations, they are to be a single piece of ply.                                                            Site Management
                                                                                                                                                                                                       Contract Partner
                Falling objects


     15.2       Work at Heights
Planning        Activity planning and   EXTREME     5     All work at heights tasks will to have an approved SWMS in place and a Work at Heights Permit.                                               Site Management
                hazard identification                                                                                                                                                                  Contract Partner
                                                          Permit must be completed for work from:
                                                             -    EWP (scissor lift or boom type EWP)
                                                             -    Man box/flying loading bay.
                                                             -    Mast climber/swing stage
                                                             -    harness use

                Fall from heights       EXTREME     1     Use of stilts is not permitted on Woollam projects                                                                                           Site Management

                Fall from heights.      EXTREME     5     Where the work at height is specifically related to another high-risk task i.e. scaffolding or formwork, that section of the                 Site Management
                                                          Project Risk Assessment should be reviewed prior to commencing work.                                                                         Contract Partner
                Falling objects

                Injury to members of    EXTREME     4     The following controls will be implemented to protect workers, the public and property below the work area:                                  Site Management
                the public form                                                                                                                                                                        Contract Partner
                                                             -    scaffolding with safety mesh,
                objects falling from
                heights                                      -    safety/catch nets,
                                                             -    the erection of a gantry,
                                                             -    exclusion zones with signage and barricaded areas on the ground or area below the work being undertaken at
                                                                  height.
                                                             - a gantry (or overhead protective structure), (incorporating the hoarding)
                                                             - the adjoining area is closed to prevent Falling objects on or otherwise hitting members of the public in that area,
                                                                  or
                                                             - a catch platform with vertical sheeting or perimeter containment sheeting is installed.
                                                             - any penetration that exposes workers to the risk of being struck / injured by falling objects will be covered in an
                                                                  adequate manner to prevent the movement of the applied cover




                                                                                                                                             Project Hazard/Risk Assessment / Page 104 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.