Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Falling objects EXTREME 4 Penetrations 100mm and over are to be adequately covered to prevent trips and spills hazards and to ensure that objects Site Management
do not fall to the level below. Contract Partner
Slips / trips
Fall from heights. EXTREME 5 Vertical penetrations must be fully enclosed with mesh as a minimum standard. The mesh should have a small aperture, Site Management
50mm x 50mm mesh size or smaller and be capable of withstanding the potential imposed load. Contract Partner
Falling objects
Where a ply cover is used for vertical penetration, it shall be marked with signage “Danger Penetration Behind”.
Fall from heights. EXTREME 5 Where ply covers are used for penetrations, they are to be a single piece of ply. Site Management
Contract Partner
Falling objects
15.2 Work at Heights
Planning Activity planning and EXTREME 5 All work at heights tasks will to have an approved SWMS in place and a Work at Heights Permit. Site Management
hazard identification Contract Partner
Permit must be completed for work from:
- EWP (scissor lift or boom type EWP)
- Man box/flying loading bay.
- Mast climber/swing stage
- harness use
Fall from heights EXTREME 1 Use of stilts is not permitted on Woollam projects Site Management
Fall from heights. EXTREME 5 Where the work at height is specifically related to another high-risk task i.e. scaffolding or formwork, that section of the Site Management
Project Risk Assessment should be reviewed prior to commencing work. Contract Partner
Falling objects
Injury to members of EXTREME 4 The following controls will be implemented to protect workers, the public and property below the work area: Site Management
the public form Contract Partner
- scaffolding with safety mesh,
objects falling from
heights - safety/catch nets,
- the erection of a gantry,
- exclusion zones with signage and barricaded areas on the ground or area below the work being undertaken at
height.
- a gantry (or overhead protective structure), (incorporating the hoarding)
- the adjoining area is closed to prevent Falling objects on or otherwise hitting members of the public in that area,
or
- a catch platform with vertical sheeting or perimeter containment sheeting is installed.
- any penetration that exposes workers to the risk of being struck / injured by falling objects will be covered in an
adequate manner to prevent the movement of the applied cover
Project Hazard/Risk Assessment / Page 104 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.