15. Managing the Risk of Falls
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
15.1 Penetrations and Openings
Planning Fall from heights. EXTREME 4 All penetrations and openings will be provided with a fall protection cover that is: Site Management
Contract Partner
Falling objects - able to with withstand the impact and safety support of a fall onto it by any person, machinery or material.
Slips, trips, falls - installed so that it does not create a trip hazard.
- securely fixed in place to prevent it being moved or removed accidentally; and
- marked with the signage “Danger Hole Under” or “Danger Penetration Below”.
Fall from heights. EXTREME 4 Penetrations or openings that are impractical to cover will have full edge protection. Site Management
Contract Partner
Falling objects Edge protection shall be installed by a competent person and be handed over to Woollam Site Management.
Edge protection coverings will have a risk assessment completed to identify the required screening / cover that is
required to be installed.
Fall from heights. EXTREME 4 Where practicable at the time of forming up a stable cast in metal mesh capable of withstanding the potential imposed Site Management
loads will be used for penetrations with small diameters to be formed in slab. Contract Partner
Falling objects
Ply covers used on their own are not preferred however they can be used as back up to cast in mesh.
Fall from heights EXTREME 4 All lift shafts and stairwells not to be used for access, will have edge protection and be barricaded and signed to prevent Site Management
any unauthorised entry. Contract Partner
Fall from heights EXTREME 4 Handrails will be erected to all stairwells and void areas as soon as possible. Site Management
Contract Partner
Fall from heights EXTREME 4 Prior to stripping formwork all penetrations formed by the stripping will be covered and or protected. Site Management
Contract Partner
Fall from heights. EXTREME 5 As part of site inspections, penetrations will be checked to ensure that they are correctly covered – Weekly Inspection Site Management
HSE Inspection Contract Partner
Falling objects
Fall from heights. EXTREME 3 All lift shafts will have purpose designed construction access cages and lockable doors to restrict access. Site Management
Contract Partner
Falling objects
Project Hazard/Risk Assessment / Page 103 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.