Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 356, section 1. The text section number identifies this passage in the reader.
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
c. A review by a competent person is to be undertaken with a sign off provided to verify that the formwork can be removed.
With regards to post-tensioning consultation between the post tension contractor, design engineer and site foreman is to be undertaken to
verify that the required concrete strength with the final tensioning of cables has been achieved in accordance with the specification and that
the formwork can be removed.
Injury to EXTREME 1 Drop stripping will not be used on site. Site
workers Management
Contract
Partner
References AS 3610 – Formwork for concrete, Formwork COP 2016
Review and Formwork / Concrete Placement and Installation Checklist, Task observation, Weekly Site HSE inspection, Monthly audit, Safety Interaction.
Monitoring
Project Hazard/Risk Assessment / Page 114 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.