17. Concrete Structures
Residual
Proposed Controls
Rating
Initial
HOC
Risk
Risk
Activity Risk Responsible Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
17.1 Concrete Pumping
Planning for concrete Project planning HIGH 5 Prior to a major pour commencing a realistic assessment of the time of completion will be completed which allows for Site Management
pumping and set up of weather, accessibility, volume of concrete, slab and site limitations, kibble back up, restricted work times, equipment
concrete pumps back-up, equipment capacity, concrete pumper’s capacity, hose-hand’s limitations and the concrete supplier’s Contract Partner
requirements.
Impact of pipelines HIGH 5 The pump frame will be anchored to the concrete deck to minimise vibration caused by the pump motor and Site Management
and boom with hydraulics. Where concrete pumping equipment is to be set up on a street, roadway or public place approval shall be
structure, scaffold, obtained from local council as appropriate and any lane closures etc. will comply with relevant legislation.
and personnel
Traffic will be managed as per the Traffic Management section of this document.
Impact of pipelines HIGH 1 Cranes, hoist towers, scaffolding or formwork will not be used to secure pipelines. Site Management
and boom with
structure, scaffold,
and personnel
Pump placement HIGH 5 Concrete pump will be in the most favourable position to pump concrete, including allowing visual contact for pump Site Management
operator with both the pump and pour area and having clear, level area of ground with a firm base capable of
supporting the pump unit.
Project planning HIGH 5 Compressed air or water lines will be sited in a way that avoids damage and complies with the Australian Standards. Site Management
and set up of
concrete pumps
Deficient or faulty HIGH 5 Logbooks, service records, manufacture manuals, design for the equipment detailing all inspections, tests, repairs, and Site Management
pump and modifications will be located on the pump truck and be viewed prior to pour.
equipment. Contract Partner
Workers not trained HIGH 5 Operator’s certification (licence) for concrete pump operation to be sighted at induction. Site Management
/ licenced in the
activity Persons who are not appropriately qualified or do not hold the appropriate certification will not be allowed to Contract Partner
undertake tasks for which those qualifications / certifications are required.
Project Hazard/Risk Assessment / Page 115 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.