Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Use of Specific Use of rescue EXTREME 5 Specific to Energy Provider Energy Provider
Equipment LVR / HVR
equipment
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
Evacuation to emergency details.
route, isolate Contract
procedures and Partners
specific hazard to processes
prevent possible
injury Site
Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan.
unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract
Partners
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Site
familiar with assembly point and pedestrian routes. Management
location of Contract
assembly Partners
point/s or
pedestrian
traffic routes
19.9 Cyclone and High Winds
Planning for Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
cyclone event planning, Management
hazard
identification, HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
resourcing, and Management
implementation
of controls
Refer to HIGH Communicate forecast at Pre-Start Meetings and monitor conditions Via Bureau of Meteorology Site
Cyclone Management
Management
Plan
Project Hazard/Risk Assessment / Page 139 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.