Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Use of Specific Tarps, Ratchet HIGH 5 Training, correct use of tools and equipment. Appropriate PPE Site
Equipment Straps, wire Management
rope Contract
Partners
Securing of HIGH 5 Any potential flying object risk to be tied down securely Site
materials Management
Contract
Partners
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
Evacuation to emergency details. Contract
route, isolate procedures and Partners
specific hazard processes
to prevent
possible injury
Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract
Partners
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Site
familiar with assembly point and pedestrian routes. Management
location of Contract
assembly Partners
point/s or
pedestrian
traffic routes
Site
Workers EXTREME 5 All stake holder in project must be contacted in writing regarding a site closure due to an extreme weather event Management
entering site
unauthorised Contract
and unaware of Partners
site closure
19.10 Electrical Incident
Project Hazard/Risk Assessment / Page 140 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.