Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
pedestrian
traffic routes
19.11 Elevating Work Platform Rescue
Planning Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
planning, Management
hazard
identification, HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
resourcing, and Management
implementation
of controls
List activities in Activity HIGH 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
procedure e.g. planning, Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
Evacuation to hazard details. Contract Partner
route, isolate identification,
specific hazard, resourcing, and
prevent possible implementation
injury of controls
Workers HIGH 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract Partner
Workers not HIGH 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Site
familiar with assembly point and pedestrian routes. Management
location of Contract Partner
assembly
point/s or
pedestrian
traffic routes
19.12 Explosion
Planning Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
planning, Management
Project Hazard/Risk Assessment / Page 142 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.