Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Site
Planning for Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Management
Electrical planning,
Incident hazard
identification,
resourcing, and HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
implementation Management
of controls
Site
Workers EXTREME 5 Leads will not be joined such that the total length of any such combination exceed the relevant maximum length specified in section Management
electrocuted / 2.6.7 in AS/NZS 3012 Electrical Installations - Construction
shocked Contract
Partners
Site
EXTREME 5 Do not touch casualty if they are in contact with live electrical services Management
Contract
Partners
Site
Use of Specific Incorrect use of HIGH 5 Correct PPE, adequate training for use of Low Voltage rescue kit Management
Equipment low voltage
recue kit Contract
Partners
Site
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract
route, isolate procedures and Partners
specific hazard, processes
prevent possible
injury Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract
Partners
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Site
familiar with assembly point and pedestrian routes. Management
location of Contract
assembly Partners
point/s or
Project Hazard/Risk Assessment / Page 141 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.