STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 383, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                         Residual
                                                                                                                        Proposed Controls                                                                             Responsible




                                         Rating
                                         Initial
                                          Risk




                                                                                                                                                                                                           Risk
                                                       HC
     Activity            Hazard                                                                                                                                                                                         Person
                                                                                             (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)


                                                                                                                                                                                                                    Site
Planning for         Activity           HIGH       5        Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO.                                 Management
Electrical           planning,
Incident             hazard
                     identification,
                     resourcing, and    HIGH       5        Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project.                                            Site
                     implementation                                                                                                                                                                                 Management
                     of controls

                                                                                                                                                                                                                    Site
                     Workers            EXTREME    5        Leads will not be joined such that the total length of any such combination exceed the relevant maximum length specified in section                     Management
                     electrocuted /                         2.6.7 in AS/NZS 3012 Electrical Installations - Construction
                     shocked                                                                                                                                                                                        Contract
                                                                                                                                                                                                                    Partners

                                                                                                                                                                                                                    Site
                                        EXTREME    5        Do not touch casualty if they are in contact with live electrical services                                                                              Management
                                                                                                                                                                                                                    Contract
                                                                                                                                                                                                                    Partners

                                                                                                                                                                                                                    Site
Use of Specific      Incorrect use of   HIGH       5        Correct PPE, adequate training for use of Low Voltage rescue kit                                                                                        Management
Equipment            low voltage
                     recue kit                                                                                                                                                                                      Contract
                                                                                                                                                                                                                    Partners

                                                                                                                                                                                                                    Site
List activities in   Workers            EXTREME    5        All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan.                             Management
procedure e.g.       unfamiliar with                        Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to        emergency                              details.                                                                                                                                                Contract
route, isolate       procedures and                                                                                                                                                                                 Partners
specific hazard,     processes
prevent possible
injury               Workers            EXTREME    5        All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan.                             Site
                     unaware of                             Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact                            Management
                     hazard                                 details.                                                                                                                                                Contract
                                                                                                                                                                                                                    Partners

                     Workers not        EXTREME    5        All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency                            Site
                     familiar with                          assembly point and pedestrian routes.                                                                                                                   Management
                     location of                                                                                                                                                                                    Contract
                     assembly                                                                                                                                                                                       Partners
                     point/s or

                                                                                                                                                      Project Hazard/Risk Assessment / Page 141 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.