Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedule 2 of the [P
Requlation.
Refer to Chapter 2, part 5A and schedule 10 of the
Inteorated Planning Act 1997, and schedule 2 of the
Regulatory Provisions for relevant definitions.
Untess you answered “none af the abave” to 020,
the application requites assessment by the Office of
Irhan Management (OUM).
IDAS Assessment Checklist, Version 18.0, 10 November 2006
20. The application involves (tick applicable box/es) -
(0 (i) amaterial change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OO (i) anurban activity -
{11 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(J sinan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change °
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
C) (ii) intensive animal husbandry, or
C1 (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
( (i) an urban activity and not specified in section 2.4(2); or
(2 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for — .
© (i) anurban activity and not specified in section 2,10(2);
(1 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
(CD (il) intensive animal husbandry
(2 (ii) reconfiguring a tot- :
On land in a Major Development Area in the Urban Footprint that is:
(a) notincluded in a structure plan; and
(b) not specified in section 3.1(2).
a (iii) none of the above
Fisheries matters
For more information refer to schedule 2of the |P
Regulation,
Unless you answered “none of the above" to Q21,
the application requires assessment by the
Department of Primary Industries and Fisheries
(DPI&F).
If an agency other than DPISF is the assessment
manager for the application, DPI&F is a concurrence
agency for the application in retation to items (i) -
(iv) and an advica agency in relation to item (v).
21, The application involves: (tick the applicable box/es)
C1 (i)_ an assessable material change of use for aquaculture - complete Part Os of Form 1;
OO (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
Qi) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
(J (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(C](v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
wi none of the above.
Page?
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.