INTEGRATED PLANNING ACT 1997
Electricity infrastructure

For move information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above” to Q18,

ihe application triggers referral e ihe anon lo
ment is Qi: as advice

agency,

IDAS Assessment Checklist, Version 18.0, 10 November 2006

18. The application involves: {tick the applicable box/es)

Ow

OG)

Dit

OW)

aH

reconfiguring a fot where any part of the lot is —

« subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if —

« any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

« the work is located wholly or partly within 10m of a substation site;

none of the above.

 

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may trigger
this referral,

For more information refer to schedule 2 of the IP

If you answered “YES” to Q19, the application
requires assessment by the chief executive of the
department administering the Act authorising the
devetopment for the designated purpose.

It an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?

(i) intended to be supplied by a public sector entity; and
{ii) on land not owned by or on behalf of the State; and
(iii) other than development —

(a)

for the designated purpose; or

(b) carried out by, or on behalf of, the designator.

M No

CYes

 

Page 6

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published].pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.