Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
Notes 1. Survey by Noosa Shire Council on 8/6/06 2. Alignment of Leading Crest Edge of Rock Wall [MGA co-ordinates}: A. 508031mE 7081846mN B. 508036mE 7081780mN C. 508038mE 7081727mN D. 508065mE 7081698mN 3. Alignment of Centre of Submerged Projection E. 508036mE 7081724mN F. 508024mE 7081667mN 4, Transition between existing works and proposed works to be smooth. Transition between Walt and submerged projection to be smooth. 5. For wall x-section details, see drawing NRS-02 6. For submarine projection x-section details, see drawing NRS-03. a Qo 50 100 150 200 250m Thin TORRES SCALE DRAWN | REVISIONS. _ DRAWING N° REV. INTERNATIONAL COASTAL OUTER NOOSA RIVER SPIT Shown " “jeem @ PANAGEMENT EROSION PROTECTION WORKS ‘s B Corbett BE wee 20.1 71 GOLD COAST MAIL CENTRE FAX OT S582 0147 for Noosagaine COUNCIL ame | LAYOUT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.