Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
“|
5
i
;
gids
BERGER
H5e50
& Rox be ante, untackred, duratio ord afable
‘pupae.
6 Gootentia to bo Terraffx B00R or equicient wih min.
Jmlnpe. Thin wil provide an actecucie Sher retarted
far of lernt 50 yours,
7, Trowell chrignod os a florbie struchre arc ep up of
fhe well rey be cecuirod. As auch, ary achverss aflocts
‘Concrete Path Boardaeik
Larpe rocks and/or cortziners
ray be placed at bane of wall above sand level]
$0 creaia caves anil crovices for marine habitat
faeg wih firber viewing platforms.
Existing Profile
Tidd Bench up &n
er me == =
o O58 10 15 20 25m
pot Ta TORE COPED] SCALE SIONS _ DRAWING N° REV.
lieu me oe Hector NOOSA RIVER SPIT hs DRAWN L REVISIONS, |
heu\S- EROSION PROTECTION WORKS — BCorbett BE; RS 02
P.O.BOXx 7196 et 07 Sa Ose DATE APPROVED
GOLD COAST MAIL CENTRE for NOOSA SHIRE COUNCIL TYPICAL X-SECTION
AUSTRALIA 9726 _ EMAL [email protected]! é 4776 LA Jackoon QB 2575
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.