Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
4 Sand filled Geotextile Container 1.3m ' 0.2m allowance for settlement 3.8m Ree 0 1 2 ITeRATIONAL, cops wmv NOOSA RIVER SPIT Seelea eileen = B Corbett Of hae WAM irae EROSION PROTECTION WORKS =. — | GOLDCOASTMAL CENTRE for NOOSA SHIRE COUNCIL | pana EMAIL [email protected] @ AIRS LA Jecsson QP 2876 Notes 1. Alignment as per drawing NSC-01. 2. Typical levels by Noosa Shire Council July 2006. 3. Tides [Noosa Beach] HAT = 1.06m AHD MHWS 0.62m AHD MLWS -0.80m AHD LAT -1.12mAHD 4. Design Conditions [2%] Waves Hs =0.75m Current = 2.5mV/s Storm surge = 1.8m 5. Geotextile to be ELCOMax 1200R or equivalent May be reinforced to provide improved vandal resistance. Nominal size equivalent to "T1". 6. Inlet ports to be "screw and glue” closures spaced at 10m intervals along the container. 7. The structure is designed to be flexible and any adverse effects from potential erosion can be accommodated. In the event of substantial HAT MHWS AHD erosion, placement of an additional container ‘on the shoreward side may be required. MLWS LAT Natural Surface Level Approx. -2.4m AHD [varies] aes 3 4 Sm REVISIONS DRAWING N® REV. NRS-03 SUBMERGED PROJECTION TYPICAL X-SECTION
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.