Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
3 Queensland ¥S Government . Maritime Safety Queensland 15 January 2007 Noosa Shire Council PO Box 14) Tewantin Qld 4565 Queensland Transport Att: Kristopher Boody Dear Kristopher Tidal Works — Request for comments - Rockwalt Noosa River Mouth — South Side Thank you for your emails of 3 January 2007 and 11 January 2007 about your application construct a sea wall at the location mentioned above. As a concurrence agency under the Integrated Planning Act 1997 and Coastal Protection Management Act 1995, Maritime Safety Queensland has no objection to the proposal provided the following navigation and marine safety conditions are addressed. 1. The construction must comply with International Coastal Management, Drawing No NRS-01 to O3inc, attached to your emails dated 3 January 2007 and 11 January 2007. 2. You, or your agent, must advise the Harbour Master the commencement date, proposed timetable, and contractor contact details at least two weeks before commencing construction. 3. You, or your agent, must issue any notices the Harbour Master requires. 4. You, or your agent, must advise the Harbour Master when you have completed construction. 5. You, or your agent, must remove any obstructions and debris encountered during construction, and dispose of them, as the Harbour Master requires. 6. Any ships and equipment you or your agent use must comply with the Zransport Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995. Maritime Safety Queenstand Our ret 710/01489 618596 £18627 Marine Operations (Brisbane) Your ref MacArthur Avenue East Enquiries Peter Marchbank Pinkenba Queensland 4008 Telephone +61 7 3860 3566 Facsimile +617 3860 3571 ABN 13 200 330 520 Wobsite www.msq.qid.gov.au Emal? peter [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.