07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

7. The contractor must complete construction within two years from the date of approval. If

construction is not completed, you will need additional or amended comments from the Regiona}
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are

et.
Ss sincer, )

———

aptain Richard C Johnson
egional Harbour Master (Brisbane)

 

Maritime Safety Queensland Page 2 of2

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published].pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.