Council archive · source document
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198
INTEGRATED PLANNING ACT 1997
Major hazard facilities or possible 6.
major hazard facilities
For more information refer to Guide 17.
If you answered "YES" to Q6, the apptication
fequires assessment by the Deparnent of
Emeraency Services (DES).
If an agency other than DES is the assessment
Manager for the application, DES is a concurrence
agency for the application in relation to this matter.
Water related development under the | 7.
Water Act 2000
For more information about items (a) - {d), refer to
Guide 15. For more information about item (e),
tefer to Guide 14 Does my application involve
assessment of a referable dam?
Unless you answered “none of the above" to Q7, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW).
If an agency other than NRMW is the assessment
manager for the applicalion, NRMW is a
concurrence agency for the application in relation to
this matter.
IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
(INO
(1 YES - complete Part L of Form 1
The application involves:
(1 (i) operational! work, for taking or interfering with water under the Water Act 2000, that is:
(tick applicable box/es}
Ol)
Cb)
O©
OW
Ole)
OM
in a watercourse, lake or spring, or from a dam constructed on a watercourse (eg.
a pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ko, K3, Ks, Ke, or Ko of
Form 1 whichever is applicable;
for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 1;
for a subartesian bore, in declared groundwater area’, for use for purposes other
than stock and/or domestic use - complete Part K: of Form 1;
for a subartesian bore, in certain declared groundwater area, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
for constructing a referable, dam® or that will increase the storage capacity of a
teferable dam by more than 10% - complete Part Ks of Form 1; or
for taking or interfering with overland flow water - complete Parts Ka and G of Form 1
rd (ii) none of the above.
Removal of quarry material from a 8.
watercourse
For more information refer to Guide 16.
Ifyou answered YES” to Q8, the application
requires assessment by the Department of Natural
Resources Mines and Water (NRMW).
It an agency other than NRMW is the assessment
manager for the application, NRMW is a
Concurrence agency for the application in relalion to
this matter,
Note; Part G of Form 1 is required to be completed
as the activity of removing quarry material from a
watercourse is also an Environmentally Relevant
Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?
Mino
(YES - complete Parts Kr and G of Form 1
7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area.
8 Referable dam is defined under tha Water Act 2000.
8 Watercourse is defined in sch 10 of the IPA.
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.