Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

07/0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published] · 142007.198

of 25

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works ina tidal areaor |9. The application involves operational work that is: ( tick the applicable box/es)

coastal management district For more (\(i)__ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work | in locat Coastal Act) that.is not prescribed tidal work — complete Part M of Form 1; OF

ae veal aan ete ioca.ne| AIK). tidal work that is prescribed tidal work"" other than in a canal’? -complete Part P of Form 1, OF
inless you answered ‘none of the above’ , ” . a oa

application requires assessment by the 0 (ii) carried out within a coastal management district under the Coastal Act and for - complete

Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.

Feet ie niceion EPA seoncerence (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.

agency for the application In relation to this matter. other than those works in tidal water) where the development has been determined not

Local government is the assessment manager for all to be assessable against the Water Act 2000 ;

prescribed tidal work.

(J (b) constructing a canat'2 intended to be connected to tidal waters;

CA (c) constructing an artificial waterway;

(J Qa): reclaiming land under tidal water;

(J (e) disposing of dredge spoil or other solid waste material in tidal water;

(J (f) _ interfering with quarry material on State coastal land above high-water mark;

(1 (gq) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(J (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

(1 (i) constructing a bank or bund wall to establish a ponded pasture on tand, other
than State coastal land, above high-water mark; or

(1 (iv) none of the above.

 

 

Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)

mark information rete fo Guide 18, For moe C1 (i) tidat work"? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local - Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

Prec nr oneuet*ane eet oor (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; oF

the application iggers rferral to Queensland — C (ii) carried out within a coastal management district'S under the Coastal Act and for -
Hanser! (27) oii Safe Ot as ° (1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager for all M of Form 1;

preserioed tidal work (1 (b} reclaiming land under tidal water - complete Part M of Form 1; oF

(6) constructing a canal's, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;

wiv) none of the above.

 

Coastal management 11. The application involves: (tick the applicable box/es)

For mare information refer to Guide 18. CJ (i) a material change of use assessable under a planning scheme involving operational
Unless you answered "none of the above" to Q11, 7 + etic tS

the appition requires assessment bythe work carried out completely or partly in a coastal management district

Enyironmental Protection Agency {EPA} OD (ii) a material change of use assessable under a planning scheme involving building
fan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -

manager for the application, EPA is aconcurrence |. .

agency for the application in relation to this matter. « the construction of a new premises with a GFA" of at least 1000m?

« the enlargement of the GFA of existing premises by more than 1000m?

0 (ii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

Oi (iv) reconfiguring a jot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canal'® ~ complete Part M of Form 1

fj (v) none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

41. Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidat works completely or partly within a local government tidal area.

42 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 Canal means canal as defined under the Coastal Protection and Management Act 1995

17 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

18 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by tha application for the operational works to construct the artificial waterway.

Page 4

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published].pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.