Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                               provide a minimum
                               of 3 experts who are
                               qualified in the
                               relevant area of
                               expertise for Noosa
                               Council consideration
                               and Noosa Council’s
                               acceptance of 1
                               expert for the peer
                               review.
*(A5.3) Facilitate a           3 + study tours         30 June   On hold    Study tour 1 was in planning for
minimum of three study         facilitated during      2022                 2020 but has been placed on
tours of relevant sites in     the three-year                               hold due to COVID-19 travel
line with objectives and       term of this                                 restrictions.
scope of the program in        Agreement, if
Australia/US if requested      requested by                                 The study tour schedule will be
by Noosa Council (flights      Noosa Council.                               revisited by TNC and NSC once
and incidentals covered                                                     COVID-19 travel restrictions have
separately by Noosa                                                         been eased or lifted.
Council, accommodation
and in country travel
covered by this Grant).
*(A5.4) Review and             1 Conservation          30 June   On track   If requested by Noosa Shire
feasibility of opportunities   Action Plan             2022                 Council
for sustainable commercial     developed, as
and recreational fishing       required
management options for
the Noosa River.               1 set of
                               Community
                               Workshops
                               facilitated, as
                               required.
*(A5.5) Facilitate access to   1+ new formal           30 June   On track   TNC have provided two peer
TNC conservation               networking              2022                 reviews when requested on the
networks and researchers       connections                                  following:
if requested by Noosa          facilitated to                               1. Draft Noosa River Plan
Council.                       assist Noosa                                 2. Fishing Futures Report
                               Council with
                               ongoing and
                               future marine
                               conservation
                               activities*

                               * As and if
                               requested by
                               Noosa Council
(A5.6) Promote Noosa           1+ presentations        30 June   On track   Reef Builder presentation,
Council’s Noosa River Plan     given at national       2022                 including the Noosa Project given
and shellfish restoration      conference/s                                 at the International Conference
project in at least one        over 3 years                                 for Shellfish Reef Restoration at
national and one                                                            Port Stephens (April 2021)
international conference.      1+ presentations
                               given at                                     Reef Builder presentation with a
                               international                                spotlight on Noosa given at the

                                                                                                                17
Log in to download the original file

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.