outcomes of community additional 2+
consultation. sites as agreed
to by
stakeholders, in
the Noosa River
estuary
2+ additional
sites recovered
with at least an
overall
additional
600m2 surface
area of
established
oyster reef,
constructed in
the Noosa River
estuary.
Se;(A4.3) Monitoring and 1 related reef As Delayed The Monitoring, Evaluation and
evaluation study for both monitoring required Reporting (MER) Plan is in place.
pilot and full restoration program Water quality monitoring has
sites. Monitoring to established commenced with local partner,
include oyster metrics, NICA. Trials of Remote
invertebrates, and fish use 2 six monthly Underwater Video (RUV)
(detailed in MER plan). status reports techniques has commenced with
submitted local partner, Ozfish. Baseline
monitoring to commence with
2 annual selected partner, Ecological
monitoring and Service Professionals, in Autumn
evaluation 2022.
report cards
produced and
published
(A5.1) Run workshop with 1 workshop 31 March Achieved TNC and NSC met regularly to
Noosa Council to identify facilitated 2020 discuss ideas and opportunities.
ongoing focus areas for
TNC support.
*(A5.2) Provide 5 + peer review 30 June On Track As requested
technical/peer review on reports 2022
minimum five submitted to
plans/reports/studies if Noosa Council
requested by Noosa during the
Council. three-year term
of this
Agreement, if
requested by
Noosa Council.
If Noosa Council
requests a peer
review, TNC will
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.