Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

outcomes of community         additional 2+
consultation.                 sites as agreed
                              to by
                              stakeholders, in
                              the Noosa River
                              estuary

                              2+ additional
                              sites recovered
                              with at least an
                              overall
                              additional
                              600m2 surface
                              area of
                              established
                              oyster reef,
                              constructed in
                              the Noosa River
                              estuary.
Se;(A4.3) Monitoring and      1 related reef     As         Delayed    The Monitoring, Evaluation and
evaluation study for both     monitoring         required              Reporting (MER) Plan is in place.
pilot and full restoration    program                                  Water quality monitoring has
sites. Monitoring to          established                              commenced with local partner,
include oyster metrics,                                                NICA. Trials of Remote
invertebrates, and fish use   2 six monthly                            Underwater Video (RUV)
(detailed in MER plan).       status reports                           techniques has commenced with
                              submitted                                local partner, Ozfish. Baseline
                                                                       monitoring to commence with
                              2 annual                                 selected partner, Ecological
                              monitoring and                           Service Professionals, in Autumn
                              evaluation                               2022.
                              report cards
                              produced and
                              published

(A5.1) Run workshop with      1 workshop         31 March   Achieved   TNC and NSC met regularly to
Noosa Council to identify     facilitated        2020                  discuss ideas and opportunities.
ongoing focus areas for
TNC support.
*(A5.2) Provide               5 + peer review    30 June    On Track   As requested
technical/peer review on      reports            2022
minimum five                  submitted to
plans/reports/studies if      Noosa Council
requested by Noosa            during the
Council.                      three-year term
                              of this
                              Agreement, if
                              requested by
                              Noosa Council.

                              If Noosa Council
                              requests a peer
                              review, TNC will

                                                                                                           16
Log in to download the original file

2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report(PDF, 3MB).pdf · 3.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.